The area is right. The base conditions are not.
An assumed depth or missed repair area can change material quantities, preparation time, and the price after equipment is already committed.
Record measurements, site notes, and risks with the estimate. Include separate areas, reviewed depths, base work, and density assumptions in the takeoff.