Start free trial
All trades

KeystonePro for Fencing

A straight run should not turn into a supply run.

The footage is only the beginning. Gates, corners, slopes, hardware, and access decide whether the crew can finish. Build the job around those details.

Fence installer aligning a cedar fence post at a residential property
THE WORK / FENCING
Layout to takeoffGates, posts & hardwareCrew-ready site notes

You know this day.

The missing hinge was never just a missing hinge.

Linear feet do not tell you how many gates to hang.

Two properties with the same perimeter can need very different posts, panels, footings, and labor. A single price per foot hides the difficult parts.

Map each run, corner, opening, and gate. Build a takeoff from the chosen fence system, then review slope and site conditions before quoting.

The customer moves the gate. The material list stays the same.

A change agreed in the yard can leave the office ordering one layout while the installer builds another.

Keep layout revisions, gate swing, hardware, and the customer’s approved scope together. Recalculate the affected materials before the order is confirmed.

The crew arrives ready to dig. The site is not ready for them.

Unconfirmed boundaries, utility markings, access, and demolition can derail an otherwise straightforward installation.

Use the job record for permits, prep notes, and assigned punch items. Bring surveys, utility-locate status, and access checks into the same handoff.

Layout to loadout

Draw the fence. Account for the whole job.

Turn measured runs and openings into a reviewable material plan. A layout is a planning aid, not a property survey.

K●Privacy fence installationExample job
Job scope184 ftexample fence line
  • Runs, corners & gate openings
  • Post spacing by fence system
  • Boundaries and utilities verified separately

Confirm boundaries, utilities, soil, slope, and manufacturer requirements before final quantities or installation.

KeystonePro Field

Keep the gate change out of the group chat.

Put the marked-up site photo, access issue, and installation detail where the next person can find them.

Capture it while you are there.

Job photos and voice notes, with comments that keep the conversation beside the evidence.

Make the next action clear.

Assigned punch items, material issues, and handoffs for the next visit. Completion goes to a manager for review.

Keep time connected to the work.

Hours by job and labor code, breaks, correction requests, and team review.

9:415G ▰
KeystonePro Field
Privacy fence installation
Fence installer aligning a cedar fence post at a residential propertyJob evidence

Customer requested the side gate open inward. Confirm against approved layout.

Related punch itemConfirm gate swing and latch operationReady for review

A photo.
The context.
The next step.

The foundation in Keystone

The job should not have to start over at every handoff.

Lead to estimate

Customer details, site notes, measurements, and proposal options stay connected.

Sold scope to crew

Job assignments, project stages, permits, and punch lists give the team a shared record.

Work to review

Job evidence and labor time keep the details available when you review the result.

Better work. Better growth.

Find the fence work worth filling your calendar with.

Connect the original enquiry to the estimate and job so you can compare the work you win, not just the number of quote requests.

Fence systemLead sourceWon scopeInstall time

Which areas and fence types bring you good jobs without expensive travel or awkward installs?

Explore Keystone marketing

Your trade. Your business.

Get the whole fence on the plan. Before it goes on the truck.

Bring the awkward handoffs, the recurring headaches, and the tools you wish you had. Let’s talk through what would make a difference.